Authorise DDS Submission

Step 7: Authorise the submission

mode: "submit" (step 8) requires the operator to authorise Epoch to file on their behalf โ€” the ยง9 step 3 gate. Without a live grant the submit returns 422 PRE_SUBMISSION_BLOCKED with an authorization_missing blocker.

POST /regulations/eudr/audit-trail/{{fp_fac_record_id}}/authorisations records the grant for the current version.

FieldRequiredNotes
confirmedYesMust be true
text_versionYesThe authorisation text version the operator agreed to (v1)
signeeNoName of the person who authorised

The grant must be the last write before submit

The signature attests to the data as it stood when signed. Any later edit to the record โ€” a plot override, a data-field change, an operator patch โ€” invalidates the grant, and the next submit blocks with authorization_invalidated. Authorise after every other write, then submit. See Create Authorisation for the full contract.

โ†’ Step 8: Submit DDS.

Required scope: eudr:write